renovation examples
These are some of the dollhouses I've restored for customers over the years. Some owners just wanted them repainted, while others needed flooring and wallpaper installed, electricity added, etc. Some of these dollhouses needed to be completely disassembled and rebuilt.
Jean’s 2nd Dollhouse
-Clean interior and exterior of dust and grime
-Remove old wallpaper
-Remove interior base molding & trim
-Remove & reinstall 2 staircases
-Install acrylic panes on 14 windows
-Repair damaged railing on widow’s walk
-Rewire and add wiring for ceiling lights
-Install wiring components
-Install wallpaper in 9 rooms
-Install interior lights and coach lights on both sides of front door
-Install flooring: tile kitchen & bath, hardwood 3 halls & living rm, carpet 3 bdrms
-Install interior window and door molding
-Install flooring edge protectors
-Install wallpaper edge protectors
-Install base molding
-Replace damaged fish scale roofing shingles and match as closely as possible
-Paint ceilings & interior trim
-Paint exterior
-Paint exterior corner, balcony, railing window & door trim
Jean’s Dollhouse
-Clean interior and exterior
-Remove old wallpaper
-Remove interior window, door, base molding trim
-Remove & reinstall staircase
-Remove & reinstall exterior window & door trim, shutters, door pediment
-Re-hang garage door
-Rewire and add wiring for ceiling lights
-Install wiring block and transformer
-Install wallpaper in 4 rooms
-Install ceiling lights and coach lights on both sides of front door
-Install hardwood flooring in living room, carpet in bedroom, tile in kitchen and bathroom
-Install interior window and door molding
-Install flooring edge protectors
-Install wallpaper edge protectors
-Install exterior siding on house and garage
-Install roofing shingles on house and garage
-Paint ceilings & interior trim flat white
-Paint exterior siding
-Paint exterior window & door trim, shutters, door pediment
-Paint front and garage doors
-Paint dollhouse base
-Install plexiglass in 4 windows
Lynn’s Dollhouse
-Clean interior and exterior
-Replace broken roofing shingles
-Replace gingerbread trim along roof ridge
-Repair loose 2nd floor stairs railing
-Make and replace broken 2nd floor balcony door pediment
-Replace plexiglass window panes on all windows and doors
-Make and replace broken ornamental trim at all 3 gable end peaks
-Reattach loose window panes on 1st floor bay window
-Paint exterior siding and trim
-Paint interior walls, ceilings and trim
-Reverse one window installed backwards
-Repair splintered plywood
-Cover plywood with painted wood strip along bottom front and sides
-Re-attach roof to side at back right corner of second floor
-Make and replace porch roof support/corner trim
-Pack and ship it back to Pennsylvania
Courtney’s Dollhouse
-Remove/reinstall the 2 staircases
-Replace 2 windows
-Replace siding
-Replace missing interior window and front door trim
-Rework window trim on 2 front windows
-Re-mount loose front doorway
-Reattach wall between BR1 and Hall on 2nd floor
-Fill old grooves cut into walls and ceilings for wiring
-Paint ceilings and interior trim
-Paint attic walls and floors
-Remove old wallpaper in all (7) 1st and 2nd floor rooms
-Paint walls in all (7) 1st and 2nd floor rooms
-Install flooring in all rooms except attic
-Add edge trim to raw plywood flooring edges on backside of house
-Repair bulging exterior siding in a few places
-Repair siding along RH corner board
-Repair siding above RH 2nd fl window
-Replace missing corner board
-Paint exterior siding, front door and trim
-Re-hang shutter
-Replace broken edge molding along front porch floor
-Add railings on wrap-around porch
-Add pitched roof over porch (without railings)
-Replace roofing with asphalt roofing and install roofing on porch roof
-Replace front step
Arlene’s Dollhouse
-Clean interior and exterior of dust and grime
-Reassemble and reinstall 3 windows
-Replace rooftop deck railing and paint white
-Paint exterior siding
-Replace broken grids on 2 French doors to rooftop deck
-Replace missing window pediments on 6 windows
-Reinstall opening panel on 1st floor right hand room
-Install single stemmed flowers in window boxes
-Install 5 white edge moldings on front edges
-Re-glue wallpaper on 1 edge
-Re-painted flooring in room under rooftop deck
-Install chandelier in LR
-Install globe ceiling light in 4 rooms
-Install 2 wall sconces in attic
-Install coach lights on front entryway and rooftop deck entryway
Maggie’s Dollhouse
-Clean interior and exterior
-Reattach attic ceiling post
-Reattach loose baluster
-Paint ceilings flat white in 4 rooms
-Stain stair treads
-Paint the risers, sides and balusters white
-Paint window trim and grids white
-Paint 2 bay window panels white
-Paint attic window white
-Paint front and balcony doors and trim white
-Paint base and door molding, channel molding white
-Install new flooring
-Install wallpaper in 4 rooms, attic and dormer
-Install lighting in all rooms
-Install sconces on both sides of front door
-Packed and shipped to back to DC
Lauren’s Dollhouse
-Fastened trim around 2nd floor windows
-Stained porch floors and roof
-Painted exterior siding and trim & interior accent walls and trim
-Re-wallpapered 4 rooms
-Installed base molding
-Installed flooring
-Cleaned dollhouse as needed
-Packed and shipped to back to Tennessee
Lisa’s Dollhouse
-Disassembled dollhouse completely.
-Replaced wallpaper in 2 first floor rooms
-Refastened floors
-Replaced 3 front windows
-Replaced front door
-Reattached stairway
-Replaced broken rear corner moldings
-Painted siding, roof, chimneys, door, windows and trim
-Installed shutters
-Reattached chimneys
Keely’s Dollhouse
Madame Alexander, Wizard of Oz dollhouse.
-Replaced broken railings
-Reattached 2 porch roofs
-Reattached 1 chimney
-Repaired bed
-Reattached 2 window panes
-Reattached decorative flowers
-Reattached heels to ruby red slippers
-Painted repaired items
-Straightened and reattached 2 areas of peeling wallpaper
-Refastened house section latch
-Trimmed and reattached door to open and close
-Repack and ship back to Chicago
Lynn’s Dollhouse
-Replaced the flooring in all 7 rooms.
Penelope’s Dollhouse
-Disassembled house, removed adhesives, paper, carpet
-Patched holes and primed all wall panels.
-Replaced front, side and closet doors
-Installed door knobs
-Installed shutters beside doors
-Painted ceilings, siding, shutters, doors
-Replaced brick on fireplace, chimney and foundation
-Repaired damaged roofing section
-Replaced roofing
-Installed wallpaper and flooring in all 9 rooms
-Replaced 10 pairs of shutters
Kellie’s Dollhouse
-Fixed front porch railings and re-attach porch to house
-Fixed balcony railings
-Removed broken decorative piece over attic window
-Removed remains of rooftop widows walk
-Painted rooftop
-Added doorknobs for front entry door and balcony French doors
Alexandra’s Dollhouse
-Reattached 2 chimneys
-Repair/installed spiral staircase
-Repair/attached interior arched window trim
-Repaired 3 windows
-Replaced siding corners
-Painted siding
-Made/mounted foundation, installed brick
-Cleaned roofing
-Cleaned inside and out
-Removed foil tape and old wallpaper
-Attached floors, walls and sides
-Installed wallpaper and flooring in all rooms
-Filled doorway voids
-Added window frames
-Installed base all rooms
-Installed window casings
-Electrifed all rooms
-Added portico lights
Bonnie’s Dollhouse
-Replaced damaged siding
-Installed no-slam latch for roof/lid
-Repaired hinged front panels
-Reattached front steps
-Painted siding, trim and porch
-Replaced missing roof shingles
-Replaced corner boards
-Painted and reattached chimneys
-Replaced electrical system and wiring
-Replaced several non-working ceiling lights
-Installed front porch lights
-Replaced flooring and wallpaper
-Repaired and painted railings
-Reinstalled shutters and doors
Danielle’s Dollhouse
-Repaired and repainted porch railings
-Cleaned and repaired roof
-Painted siding and trim
-Repaired and reattached chimneys
-Painted and reattached front steps
-Repaired staircase and hand rails
-Repaired opening side wall
Jennifer’s Dollhouse
-Repaired and reattached front porch and railings
-Repaired and reattached windows and doors
-Replaced broken corner boards
-Reinstalled stairway
-Cleaned dollhouse
-Repaired roof
-Mounted house on lazy susan base
-Electrified house and added ceiling and porch lights
Caitlin’s Dollhouse
-Repaired hinged roof
-Replaced several roofing shingles
-Repainted siding and chimney
-Repaired railings
-Re-stained trim
-Replaced flooring
Jodi’s Dollhouse
-Replaced missing roofing shingles
-Re-applied wallpaper in all rooms
-Removed, cleaned and re-attached flooring in all rooms
-Repaired stairway and handrail
-Painted siding, columns and porch
-Repaired wiring and replaced electrical system
-Replaced several light fixtures